go
and get it |
|
ARCH.DESIGN
02 |
|
go and get it
|
-V |
ARCH.DESIGN
03 |
- design technical report: introduction
- current condition analysis: site description
- current condition analysis: abutment materials and pathologies
- general: preliminary workstage
- works that should have been already performed
- works that should be preliminary performed
- site organisation
- site limits
|
- go
and get it |
|
ARCH.DESIGN
04 |
- dismantling of the bridge remnants
- stabilisation of the cantilevering portions
- repair works of structural cracks of the abutment walls
- dismantling by numbering of the bridge stone pavement
- excavation of the abutment and ground stabilisation
- dismantling by numbering of the bridge stone elements
- dismantling of voussoirs: integrity limit
- demolition of existing concrete blocks
- centering erection
- hydraulic jacks
- wooden deck placement
- control of the geometry
|
- go
and get it |
|
ARCH.DESIGN
05 |
- preparatory works to reconstruction
- contact surface between ancient and new masonry
- repair of the cracks in the vaults
- remounting of the remaining portions of the bridge
- bridge construction materials
- reconstruction of destroyed parts
- lead pouring main requirements
- mortar and stone joints
- vaults (arch voussoirs)
- stiffening rib and fill
- lower cornices
- spandrels
- lightening voids and krecnjak cover slabs
- upper cornices
- parapets
- bridge pavement
- fence
|
- go
and get it |
- |
ARCH.DESIGN
06 |
- centering release
- drainage, piping and waterproofing
- finishing works
- new intervention marks
- bridge pavement remedial works
- adjacent areas works
- adjacent areas: dismantling works
- adjacent areas: remedial works
- rehabilitation of the abutments walls
- theoretical approach to the abutment walls repair works
- dismantling works in the abutment walls
- remedial works of the abutment walls
- masonry lacks repair
- remedial works for the masonry joints
- remedial works for stone fissures sealing
- remedial works for disgregate stone surfaces
- remedial works for stone protection and waterprotection
- final works
- safety of workers and of the yard
|
-go
and get it |