PHASE-B DOCUMENTS AND DRAWINGS

English english language


Phase B - final design drawings - bidding documents


 

SITE

DRW.N°

TITLE

SCALE

CAT.

PHASE

GE-01

DRAWING LIST

X

GENERAL DRAWINGS - GE

B

-

GENERAL ENGINEERING WORKGROUP

-

-

-

GE-02

LOCATION MAPS

1:2000 - 1:10M

GENERAL DRAWINGS - GE

B

-

MAPS

-

-

-

GE-03

SITE ORGANISATION

1:500

GENERAL DRAWINGS - GE

B

-

PLANIMETRY

-

-

-

GE-04

LIMIT OF THE WORKS

1:100

GENERAL DRAWINGS - GE

B

-

PLANIMETRY

-

-

-

-

REMAINING PORTIONS

DRW.N°

TITLE

SCALE

CAT.

PHASE

CU-01

SITE PLAN AND FLOORING

1:100 - 1:200

CURRENT CONDITION - CU

B

-

PLANIMETRY AND PLAN VIEW

-

-

-

CU-02

BRIDGE ELEVATION

1:50

CURRENT CONDITION - CU

B

-

NORTH ELEVATION

-

-

-

CU-03

BRIDGE ELEVATION

1:50

CURRENT CONDITION - CU

B

-

SOUTH ELEVATION

-

-

-

CU-04

ABUTMENT WALLS (constr. materials)

1:50

CURRENT CONDITION - CU

B

-

EAST BANK

-

-

-

CU-05

ABUTMENT WALLS (constr. materials)

1:50

CURRENT CONDITION - CU

B

-

WEST BANK

-

-

-

CU-06

ABUTMENT WALLS (pathologies)

1:50

CURRENT CONDITION - CU

B

-

EAST BANK

-

-

-

CU-07

ABUTMENT WALLS (pathologies)

1:50

CURRENT CONDITION - CU

B

-

WEST BANK

-

-

-

-

DS-01

SITE PLAN AND FLOORING

1:100 - 1:200

DISMANTLING WORKS - DS

B

-

PLANIMETRY AND PLAN VIEW

-

-

-

DS-02

ABUTMENT WALLS

1:50

DISMANTLING WORKS - DS

B

-

EAST BANK

-

-

-

DS-03

ABUTMENT WALLS

1:50

DISMANTLING WORKS - DS

B

-

WEST BANK

-

-

-

-

RM-01

SITE PLAN AND FLOORING

1:100 - 1:200

REMEDIAL WORKS - RM

B

-

PLANIMETRY AND PLAN VIEW

-

-

-

RM-02

ABUTMENT WALLS

1:50

REMEDIAL WORKS - RM

B

-

EAST BANK

-

-

-

RM-03

ABUTMENT WALLS

1:50

REMEDIAL WORKS - RM

B

-

WEST BANK

-

-

-

-

BRIDGE

DRW.N°

TITLE

SCALE

CAT.

PHASE

RF-01

GLOBAL REFERNCES

1:50

REFERENCES - RF

B

-

NORTH ELEVATION AND PLAN

-

-

-

RF-02

GLOBAL REFERNCES

1:50

REFERENCES - RF

B

-

SOUTH ELEVATION AND PLAN

-

-

-

RF-03

ELEV. COMPARING AND LEVELS

1:50

REFERENCES - RF

B

-

ELEVATIONS AND TRANSV. SECTIONS

-

-

-

RF-04

INNER LEVELS – NORTH SIDE

1:50

REFERENCES - RF

B

-

LONGITUDINAL SECTION

-

-

-

RF-05

INNER LEVELS – SOUTH SIDE

1:50

REFERENCES - RF

B

-

LONGITUDINAL SECTION

-

-

-

RF-06

INTRADOS CO-ORDINATES

1:50

REFERENCES - RF

B

-

NORTH AND SOUTH ELEVATION

-

-

-

RF-07

EXTRADOS CO-ORDINATES

1:50

REFERENCES - RF

B

-

NORTH AND SOUTH ELEVATION

-

-

-

RF-08

FLOORING REFERNCES

1:50

REFERENCES - RF

B

-

PLAN VIEW AND SECTIONS

-

-

-

-

RE-01

SITE PLAN

1:100 - 1:200

RECONSTRUCTION WORKS - RE

B

-

PLANIMETRY AND PLAN VIEW

-

-

-

RE-02

BRIDGE ELEVATION

1:50

RECONSTRUCTION WORKS - RE

B

-

NORTH ELEVATION

-

-

-

RE-03

BRIDGE ELEVATION

1:50

RECONSTRUCTION WORKS - RE

B

-

SOUTH ELEVATION

-

-

-

RE-04

BRIDGE SECTIONS AND DETAILS

1:20 - 1:50

RECONSTRUCTION WORKS - RE

B

-

TRANSVERSAL SECTION

-

-

-

RE-05

BRIDGE SECTIONS AND DETAILS

1:20 - 1:50

RECONSTRUCTION WORKS - RE

B

-

LONGITUDINAL SECTION

-

-

-

RE-06

TECHNOLOGICAL DETAILS

1:5 - 1:10 - 1:20

RECONSTRUCTION WORKS - RE

B

-

BRIDGE ARCH

1:100

-

-

RE-07

TECHNOLOGICAL DETAILS

1:1 - 1:5 - 1:10

RECONSTRUCTION WORKS - RE

B

-

BRIDGE ELEMENTS

1:20

-

-

RE-08

BRIDGE FLOORING

1:50

RECONSTRUCTION WORKS - RE

B

-

PLAN VIEW AND DETAILS

1:10 - 1:20

-

-

RE-09

DRAINAGE SYSTEM AND IMPERMEAB.

1:100 - 1:500

RECONSTRUCTION WORKS - RE

B

-

PLANIMETRY AND SECTIONS

1:20

-

-

RE-10

NEW INTERVENTION MARKS

1:2 - 1:10 - 1:50

RECONSTRUCTION WORKS - RE

B

-

PLAN VIEW AND ELEVATIONS

-

-

-

-

PH-01

CONSTRUCTION PHASES - A

X

CONSTRUCTION PHASES - PH

B

-

SCHEMES

-

-

-

PH-02

CONSTRUCTION PHASES - B

X

CONSTRUCTION PHASES - PH

B

-

SCHEMES

-

-

-

-

MATERIALS

DRW.N°

TITLE

SCALE

CAT.

PHASE

SC-01

ARCH STONES DIMENSIONS

1:25 - 1:100

STONE CUT - SC

B

-

NORTH ELEVATION

-

-

-

SC-02

ARCH STONES DIMENSIONS

1:25 - 1:100

STONE CUT - SC

B

-

SOUTH ELEVATION

-

-

-

SC-03

ARCH ROW PLANS

1:50

STONE CUT - SC

B

-

ARCHIVOLT

-

-

-

SC-04

SPANDREL STONES DIMENSIONS

1:25

STONE CUT - SC

B

-

NORTH ELEVATION

-

-

-

SC-05

SPANDREL STONES DIMENSIONS

1:25

STONE CUT - SC

B

-

SOUTH ELEVATION

-

-

-

SC-06

SPANDRELS LEVELS

1:25

STONE CUT - SC

B

-

NORTH AND SOUTH ELEVATION

-

-

-

SC-07

CORNICES DIMENSIONS

1:25

STONE CUT - SC

B

-

NORTH ELEVATION

-

-

-

SC-08

CORNICES DIMENSIONS

1:25

STONE CUT - SC

B

-

SOUTH ELEVATION

-

-

-

SC-09

PARAPETS DIMENSIONS

1:25 - 1:50

STONE CUT - SC

B

-

NORTH AND SOUTH ELEVATIONS

-

-

-

SC-10

FLOORING LAYOUT AND DIMENSIONS

1:20 - 1:50 -1:200

STONE CUT - SC

B

-

TOP PLAN VIEW

-

-

-

-

DRW.N°

TITLE

SCALE

CAT.

PHASE

ME-01

FENCE LAYOUT AND DIMENSIONS

1:1 - 1:5 - 1:1:25

METAL ELEMENTS - ME

B

-

NORTH AND SOUTH ELEVATIONS

-

-

-

ME-02

CRAMPS AND DOWELS

1:5 - 1:20 - 1:25

METAL ELEMENTS - ME

B

-

NORTH ELEVATION AND PLAN VIEW

-

-

-

ME-03

CRAMPS AND DOWELS

1:5 - 1:20 - 1:25

METAL ELEMENTS - ME

B

-

SOUTH ELEVATION AND PLAN VIEW

-

-

-

Drawings that have been removed from the bidding documents by the Experts.

EXCLUDED DRAWINGS

DRW.N°

TITLE

SCALE

CAT.

PHASE

XX-01

ADDITIONAL 3D VIEWS

X

CONSTRUCTION PHASES - PH

B

-

SCHEMES

-

-

-

XX-02

AXONOMETRIC VIEWS - 3D MODELS

X

RECONSTRUCTION WORKS - RE

B

-

BRIDGE AND SURROUNDINGS

-

-

-

Some other drawings, pertaining the survey of Towers and adjacent buildings, have been provided in their final layout, but they will not presumably be inserted in this Bidding Documentation for the rehabilitation of the bridge, since, another Company is foreseen to perform the restoration design of the Towers, and another yard will be organised for the purpose.

ADDITIONAL SURVEY DRAWINGS

DRW.N°

TITLE

SCALE

CAT.

PHASE

TW-01

HALEBIJA TOWER AND SURROUNDINGS

1:50

TOWERS & ADJ. BUILD. - TW

B

-

ELEVATIONS

-

-

-

TW-02

TARA TOWER AND SURROUNDINGS

1:50

TOWERS & ADJ. BUILD. - TW

B

-

ELEVATIONS

-

-

-

The above mentioned survey of the towers and buildings is limited to the outer elevations, as foreseen by contractual terms, and are provided either in paper copy, either in digital vectorial format.

It is important to underline that the above surveys should be prosecuted with data pertaining plans and sections before any design work is performed, and it is required that any incoherence should be communicated to General Engineering until final acceptance of the drawings by the Design team for the Towers, in order that no mismatching arise during further work stages.

Stone cut design, either SC-rough, either SC-final, of all the stones have been performed trough the use of charts that have been organised in four different books (for a global amount of 45000 data). These books contain both the dimensions of the stones and all the co-ordinates of the intrados and extrados curves of the bridge arch. Books have been subdivided as follows:

  • stone cut - book 01 – SMS-A Stari Most Stones – Arch
  • stone cut - book 02 – SMS-A Stari Most Stones – Arch
  • stone cut - book 03 – SMS-A Stari Most Stones – Arch
  • stone cut - book 04 – SMS-B Stari Most Stones – Bridge

Drawings and charts should be attached to the final reporting documentation here next listed:

  • Phase B report – architectural final report (this report);
  • Phase B report – structural final report (structure calculations).

All the above mentioned documentation and drawings are also provided in digital format on optical disks.


CREDITS:

Intellectual property of this report and of the design drawings is owned by General Engineering s.r.l.

author of the text: arch. Manfredo Romeo – other contributes have been mentioned in related paragraphs

© - General Engineering Workgroup -

SOURCE:

Final Design Report

back   back to menu