Phase B - final design drawings - bidding
documents
SITE |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
GE-01 |
DRAWING LIST |
X |
GENERAL DRAWINGS - GE |
B |
-
|
GENERAL ENGINEERING WORKGROUP |
-
|
-
|
-
|
GE-02 |
LOCATION MAPS |
1:2000 - 1:10M |
GENERAL DRAWINGS - GE |
B |
-
|
MAPS |
-
|
-
|
-
|
GE-03 |
SITE ORGANISATION |
1:500 |
GENERAL DRAWINGS - GE |
B |
-
|
PLANIMETRY |
-
|
-
|
-
|
GE-04 |
LIMIT OF THE WORKS |
1:100 |
GENERAL DRAWINGS - GE |
B |
-
|
PLANIMETRY |
-
|
-
|
-
|
-
|
REMAINING PORTIONS |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
CU-01 |
SITE PLAN AND FLOORING |
1:100 - 1:200 |
CURRENT CONDITION - CU |
B |
-
|
PLANIMETRY AND PLAN VIEW |
-
|
-
|
-
|
CU-02 |
BRIDGE ELEVATION |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
NORTH ELEVATION |
-
|
-
|
-
|
CU-03 |
BRIDGE ELEVATION |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
SOUTH ELEVATION |
-
|
-
|
-
|
CU-04 |
ABUTMENT WALLS (constr. materials) |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
EAST BANK |
-
|
-
|
-
|
CU-05 |
ABUTMENT WALLS (constr. materials) |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
WEST BANK |
-
|
-
|
-
|
CU-06 |
ABUTMENT WALLS (pathologies) |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
EAST BANK |
-
|
-
|
-
|
CU-07 |
ABUTMENT WALLS (pathologies) |
1:50 |
CURRENT CONDITION - CU |
B |
-
|
WEST BANK |
-
|
-
|
-
|
-
|
DS-01 |
SITE PLAN AND FLOORING |
1:100 - 1:200 |
DISMANTLING WORKS - DS |
B |
-
|
PLANIMETRY AND PLAN VIEW |
-
|
-
|
-
|
DS-02 |
ABUTMENT WALLS |
1:50 |
DISMANTLING WORKS - DS |
B |
-
|
EAST BANK |
-
|
-
|
-
|
DS-03 |
ABUTMENT WALLS |
1:50 |
DISMANTLING WORKS - DS |
B |
-
|
WEST BANK |
-
|
-
|
-
|
-
|
RM-01 |
SITE PLAN AND FLOORING |
1:100 - 1:200 |
REMEDIAL WORKS - RM |
B |
-
|
PLANIMETRY AND PLAN VIEW |
-
|
-
|
-
|
RM-02 |
ABUTMENT WALLS |
1:50 |
REMEDIAL WORKS - RM |
B |
-
|
EAST BANK |
-
|
-
|
-
|
RM-03 |
ABUTMENT WALLS |
1:50 |
REMEDIAL WORKS - RM |
B |
-
|
WEST BANK |
-
|
-
|
-
|
-
|
BRIDGE |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
RF-01 |
GLOBAL REFERNCES |
1:50 |
REFERENCES - RF |
B |
-
|
NORTH ELEVATION AND PLAN |
-
|
-
|
-
|
RF-02 |
GLOBAL REFERNCES |
1:50 |
REFERENCES - RF |
B |
-
|
SOUTH ELEVATION AND PLAN |
-
|
-
|
-
|
RF-03 |
ELEV. COMPARING AND LEVELS |
1:50 |
REFERENCES - RF |
B |
-
|
ELEVATIONS AND TRANSV. SECTIONS |
-
|
-
|
-
|
RF-04 |
INNER LEVELS – NORTH SIDE |
1:50 |
REFERENCES - RF |
B |
-
|
LONGITUDINAL SECTION |
-
|
-
|
-
|
RF-05 |
INNER LEVELS – SOUTH SIDE |
1:50 |
REFERENCES - RF |
B |
-
|
LONGITUDINAL SECTION |
-
|
-
|
-
|
RF-06 |
INTRADOS CO-ORDINATES |
1:50 |
REFERENCES - RF |
B |
-
|
NORTH AND SOUTH ELEVATION |
-
|
-
|
-
|
RF-07 |
EXTRADOS CO-ORDINATES |
1:50 |
REFERENCES - RF |
B |
-
|
NORTH AND SOUTH ELEVATION |
-
|
-
|
-
|
RF-08 |
FLOORING REFERNCES |
1:50 |
REFERENCES - RF |
B |
-
|
PLAN VIEW AND SECTIONS |
-
|
-
|
-
|
-
|
RE-01 |
SITE PLAN |
1:100 - 1:200 |
RECONSTRUCTION WORKS - RE |
B |
-
|
PLANIMETRY AND PLAN VIEW |
-
|
-
|
-
|
RE-02 |
BRIDGE ELEVATION |
1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
NORTH ELEVATION |
-
|
-
|
-
|
RE-03 |
BRIDGE ELEVATION |
1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
SOUTH ELEVATION |
-
|
-
|
-
|
RE-04 |
BRIDGE SECTIONS AND DETAILS |
1:20 - 1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
TRANSVERSAL SECTION |
-
|
-
|
-
|
RE-05 |
BRIDGE SECTIONS AND DETAILS |
1:20 - 1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
LONGITUDINAL SECTION |
-
|
-
|
-
|
RE-06 |
TECHNOLOGICAL DETAILS |
1:5 - 1:10 - 1:20 |
RECONSTRUCTION WORKS - RE |
B |
-
|
BRIDGE ARCH |
1:100 |
-
|
-
|
RE-07 |
TECHNOLOGICAL DETAILS |
1:1 - 1:5 - 1:10 |
RECONSTRUCTION WORKS - RE |
B |
-
|
BRIDGE ELEMENTS |
1:20 |
-
|
-
|
RE-08 |
BRIDGE FLOORING |
1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
PLAN VIEW AND DETAILS |
1:10 - 1:20 |
-
|
-
|
RE-09 |
DRAINAGE SYSTEM AND IMPERMEAB. |
1:100 - 1:500 |
RECONSTRUCTION WORKS - RE |
B |
-
|
PLANIMETRY AND SECTIONS |
1:20 |
-
|
-
|
RE-10 |
NEW INTERVENTION MARKS |
1:2 - 1:10 - 1:50 |
RECONSTRUCTION WORKS - RE |
B |
-
|
PLAN VIEW AND ELEVATIONS |
-
|
-
|
-
|
-
|
PH-01 |
CONSTRUCTION PHASES - A |
X |
CONSTRUCTION PHASES - PH |
B |
-
|
SCHEMES |
-
|
-
|
-
|
PH-02 |
CONSTRUCTION PHASES - B |
X |
CONSTRUCTION PHASES - PH |
B |
-
|
SCHEMES |
-
|
-
|
-
|
-
|
MATERIALS |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
SC-01 |
ARCH STONES DIMENSIONS |
1:25 - 1:100 |
STONE CUT - SC |
B |
-
|
NORTH ELEVATION |
-
|
-
|
-
|
SC-02 |
ARCH STONES DIMENSIONS |
1:25 - 1:100 |
STONE CUT - SC |
B |
-
|
SOUTH ELEVATION |
-
|
-
|
-
|
SC-03 |
ARCH ROW PLANS |
1:50 |
STONE CUT - SC |
B |
-
|
ARCHIVOLT |
-
|
-
|
-
|
SC-04 |
SPANDREL STONES DIMENSIONS |
1:25 |
STONE CUT - SC |
B |
-
|
NORTH ELEVATION |
-
|
-
|
-
|
SC-05 |
SPANDREL STONES DIMENSIONS |
1:25 |
STONE CUT - SC |
B |
-
|
SOUTH ELEVATION |
-
|
-
|
-
|
SC-06 |
SPANDRELS LEVELS |
1:25 |
STONE CUT - SC |
B |
-
|
NORTH AND SOUTH ELEVATION |
-
|
-
|
-
|
SC-07 |
CORNICES DIMENSIONS |
1:25 |
STONE CUT - SC |
B |
-
|
NORTH ELEVATION |
-
|
-
|
-
|
SC-08 |
CORNICES DIMENSIONS |
1:25 |
STONE CUT - SC |
B |
-
|
SOUTH ELEVATION |
-
|
-
|
-
|
SC-09 |
PARAPETS DIMENSIONS |
1:25 - 1:50 |
STONE CUT - SC |
B |
-
|
NORTH AND SOUTH ELEVATIONS |
-
|
-
|
-
|
SC-10 |
FLOORING LAYOUT AND DIMENSIONS |
1:20 - 1:50 -1:200 |
STONE CUT - SC |
B |
-
|
TOP PLAN VIEW |
-
|
-
|
-
|
-
|
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
ME-01 |
FENCE LAYOUT AND DIMENSIONS |
1:1 - 1:5 - 1:1:25 |
METAL ELEMENTS - ME |
B |
-
|
NORTH AND SOUTH ELEVATIONS |
-
|
-
|
-
|
ME-02 |
CRAMPS AND DOWELS |
1:5 - 1:20 - 1:25 |
METAL ELEMENTS - ME |
B |
-
|
NORTH ELEVATION AND PLAN VIEW |
-
|
-
|
-
|
ME-03 |
CRAMPS AND DOWELS |
1:5 - 1:20 - 1:25 |
METAL ELEMENTS - ME |
B |
-
|
SOUTH ELEVATION AND PLAN VIEW |
-
|
-
|
-
|
Drawings that have been removed from the bidding
documents by the Experts.
EXCLUDED DRAWINGS |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
XX-01 |
ADDITIONAL 3D VIEWS |
X |
CONSTRUCTION PHASES - PH |
B |
-
|
SCHEMES |
-
|
-
|
-
|
XX-02 |
AXONOMETRIC VIEWS - 3D MODELS |
X |
RECONSTRUCTION WORKS - RE |
B |
-
|
BRIDGE AND SURROUNDINGS |
-
|
-
|
-
|
Some other drawings, pertaining the survey of Towers
and adjacent buildings, have been provided in their final layout, but they
will not presumably be inserted in this Bidding Documentation for the
rehabilitation of the bridge, since, another Company is foreseen to
perform the restoration design of the Towers, and another yard will be
organised for the purpose.
ADDITIONAL SURVEY DRAWINGS |
DRW.N° |
TITLE |
SCALE |
CAT. |
PHASE |
TW-01 |
HALEBIJA TOWER AND SURROUNDINGS |
1:50 |
TOWERS & ADJ. BUILD. - TW |
B |
-
|
ELEVATIONS |
-
|
-
|
-
|
TW-02 |
TARA TOWER AND SURROUNDINGS |
1:50 |
TOWERS & ADJ. BUILD. - TW |
B |
-
|
ELEVATIONS |
-
|
-
|
-
|
The above mentioned survey of the towers and buildings
is limited to the outer elevations, as foreseen by contractual terms, and
are provided either in paper copy, either in digital vectorial format.
It is important to underline that the above surveys
should be prosecuted with data pertaining plans and sections before any
design work is performed, and it is required that any incoherence should
be communicated to General Engineering until final acceptance of the
drawings by the Design team for the Towers, in order that no mismatching
arise during further work stages.
Stone cut design, either SC-rough, either SC-final, of
all the stones have been performed trough the use of charts that have been
organised in four different books (for a global amount of 45000 data).
These books contain both the dimensions of the stones and all the
co-ordinates of the intrados and extrados curves of the bridge arch. Books
have been subdivided as follows:
- stone cut - book 01 – SMS-A Stari Most Stones – Arch
- stone cut - book 02 – SMS-A Stari Most Stones – Arch
- stone cut - book 03 – SMS-A Stari Most Stones – Arch
- stone cut - book 04 – SMS-B Stari Most Stones – Bridge
Drawings and charts should be attached to the final
reporting documentation here next listed:
- Phase B report – architectural final report (this report);
- Phase B report – structural final report (structure calculations).
All the above mentioned documentation and drawings are