Inst./Firm |
description |
PCU |
Project Co-ordination
Unit - (employer: City of Mostar) |
PCU
TA |
Project Co-ordination
Unit Technical Assistance |
UNESCO |
United Nations
Educational, Scientific and Cultural Organisation |
ICE |
International
Committee of Experts |
WB |
World Bank |
ICHM |
Institute for
Preservation of Cultural, Historical and Natural Heritage of Mostar |
CONEX |
CONEX - Company in
charge of the investigations |
LGA |
LGA - Company in
charge of the laboratory tests |
GE |
General Engineering
– Company in charge of the design of the bridge |
OG |
Omega Engineering –
Company in charge of the design of the towers |
WS |
Work Supervisor |
technical term |
description |
Phase
A |
Preliminary study and
research phase of current assignment |
Phase
B |
Final design phase of
current assignment |
Inception
report |
Starting report
(after 40 working days) |
Phase
A report |
Preliminary study
report (end of phase A) |
Phase
B report |
Final report (this
report) |
1955
survey |
Ancient survey of the
bridge held in the year 1955 |
1982
survey |
Ancient survey of the
bridge held in the year 1982 |
2000
survey |
Most likely geometry
of former bridge |
Drw |
Drawing |
BoQ |
Bill of Quantities |
ToR |
Terms of Reference
(contractual terms of the assignment) |
CAD |
Computer Aided
Drawing |
a.s.l. |
above sea level |
r.w.o. |
rain water outlet |
MPa |
Mega Pascal |
XX |
XX |
SMS |
Stari Most Stones |
SMS-A |
Stari Most Stones –
load bearing Arch |
SMS-B |
Stari Most Stones –
Bridge stones |
SMS-Bsp |
Stari Most Stones –
Bridge stones - spandrels |
SMS-Bc1 |
Stari Most Stones –
Bridge stones - lower cornices |
SMS-Bc2 |
Stari Most Stones –
Bridge stones - upper cornices |
SMS-Bpa |
Stari Most Stones –
Bridge stones - parapets |
SMS-C |
Stari Most Stones –
bridge fill and stiffening rib |
SMS-D |
Stari Most Stones –
pedestrian flooring |
SMS-RS |
Stari Most Stones –
Recovered Stones |
SMS-LS |
Stari Most Stones –
Lost Stones |
SMS-BS |
Stari Most Stones –
Built Stones |
SMS-mk |
Stari Most Stones –
marked stones |
A-1° |
Already assembled
voussoir (arch stone) |
A-2° |
Voussoir (arch stone)
to be assmbled |
XX |
XX |
QY-blocks |
quarrying of huge
blocks from the source site |
SC-rough |
rough stone cut in
parallelepipeds + (qt) min cm3 |
SC-final |
final stone cut with
final shape and dimensions |
SF-adjusting |
stone finishing and
adjusting |
qt |
Quarrying tolerance
(cm3) |
nov |
Number of voussoirs
in current row |
dev |
Deviation from row
plan |
XX |
XX |
(Drw)
GE-XX |
General Drawings |
(Drw)
CU-XX |
Current Condition
drawings |
(Drw)
RM-XX |
Remedial Works
drawings |
(Drw)
DS-XX |
Dismantling Works
drawings |
(Drw)
PH-XX |
Construction Phases
drawings |
(Drw)
RE-XX |
Reconstruction Works
drawings |
(Drw)
RF-XX |
Reference drawings |
(Drw)
SC-XX |
Stone Cut drawings |
(Drw)
ME-XX |
Metal Elements
drawings |
(Drw)
AD-XX |
Additional and
Details drawings |
(Drw)
TW-XX |
Survey of the Towers
drawings |
(Drw)
XX-XX |
Excluded drawings |