back   back to home page
PROJECT SCHEDULE AND DESIGN TEAM

PILOT CULTURAL HERITAGE PROJECT

BOSNIA AND HERZEGOVINA

Federation of Bosnia and Herzegovina

CITY OF MOSTAR

Project Coordination Unit

  

THE WORLD BANK - UNESCO

 

  

REHABILITATION OF THE OLD BRIDGE OF MOSTAR

 


1. Project schedule


List of involved Institutes and Companies:

Employer: Town of Mostar – BiH
Enterprise coordination: PCU Project Coordination Unit – Mr Rusmir Čišić - Mr Tihomir Rozić
Funds management: World Bank – Washington – USA
Bidding management: PCU TA - Technical Assistance – ing. Gilles Pequeux
Donor countries: Italy, Turkey, France, Holland, Croatia, European Bank
Promoter - supervising institute UNESCO - Paris
Partner Aga Khan Trust for Culture
Partner World Monuments Fund
Technical supervision ICE – International Committee of Experts
Technical Consultant Worl Bank consultant: arch. Carlo Blasi
Stone Cut Consultant PCU TA consultant: Jean Claude Bessac
Mortar Consultant PCU TA consultant: prof. arch. Luigia Binda
Collected Funds 16.5 milions of USD
Final Architectural Design General Engineering WorkGroup - Italy - arch. Manfredo Romeo
Final Structural Design Department of Civil Engineering  - University of Florence - prof. ing. Andrea Vignoli
Laboratory tests on materials LGA - Germany - ing. Gregor Stolarski
Geognostic surveys and design Conex – Yeralti Aramacilik – Bosnia and Turkey – ing.Zoran Steger
Works supervision Omega Engineering – Croatia – arch. Zeliko Pekovic
Foundation repair works Yapi Merkezi - Turkey - arch. Mehmet Demirer
Bridge reconstruction works ER-BU – Turkey – ing. Omer Biyikoglu

 


2. General Engineering WorkGroup


General Engineering Workgroup is here next introduced with related name, position and task:

Name

Position

phase

Task

x x

A

B

x

Mr. Gianfranco Mela

team leader

X

X

project management

 X  X   x   x   x

arch. Manfredo Romeo

staff co-ordinator

X

X

architectural design leader

tech. Giovanni Checcucci

full-time staff

X

X

photogrammetry and design

arch. Francesco Gazzotti

full-time staff

X

X

architectural design

arch. Alessio Talarico

full-time staff

X

X

architectural design

arch. Paola Marrone

full-time staff

X

X

architectural design

arch. Orazio Soleti

full-time staff

X

X

architectural design

arch. Giuseppe De Giosa

full-time staff

X

X

architectural design

arch. Franco Gualtieri

full-time staff

X

X

architectural design

arch. Patrizio Simoncini

full-time staff

X

X

architectural design

    x     x    x   x    x

stud.arch. Malika Mela

part-time staff

X

X

architectural design

stud.arch. Francesca Tartaglione

part-time staff

X

X

photogrammetry and checks

stud.arch. Antonio De Siervi

part-time staff

X

   x

architectural design

arch. Sabrina Fungi

part-time staff

X

   x

photogrammetry and survey

arch. Barbara Corazzi

part-time staff

X

   x

photogrammetry and survey

arch. Bernardo Rossi

part-time staff

X

   x

architectural design

tech. Carlo Delcroix

part-time staff

X

   x

photogrammetry and survey

tech. Paolo Fredducci

part-time staff

X

   x

photogrammetry and survey

tech. Daniele Durazzi

part-time staff

X

   x

photogrammetry and survey

tech. Miki Shinohara

full-time staff

   x

X

photogrammetry and survey

x x x   x x

arch. Maja Popovac

training

   x

X

architectural design

stud.arch. Vedran Ivankovic'

training

   x

X

architectural design

x x x x x

eng. Francesco Cenni

special works staff

X

X

computer calculations

arch. Giovanni Anzani

special works staff

   x

X

numerical management

eng. Niccolò Baldanzini

special works staff

X

   x

computer calculations

eng. Jacopo Talluri

special works staff

X

   x

computer calculations

tech. Osrenko

special works staff

   x    x

topographic survey

x x xx xx x

arch. Roberto Sabelli

consultant

   x

X

restoration expert

tech. Bruno Bonuccelli

consultant

   x

X

yard expert

eng. Giancarlo Capanni

consultant

X

   x

photogrammetry expert

eng. Franco Flamigni

consultant

X

   x

photogrammetry expert

x x x x x

Barbara Catarsi

assistant

X

X

secretary

Nadia Niccolai

assistant

X

X

secretary

 


3. Department of Civil Engineering - University of Florence


Department of Civil Engineering group is here next introduced with related name, position and task:

Name

Position

phase

Task

   x    x

A

B

   x

prof.eng. Andrea Vignoli

staff co-ordinator

X

X

structural design leader

prof.eng. Paolo Spinelli

staff co-ordinator

X

X

structural design

prof.eng. Franco Angotti

consultant

X

X

structural design

   x    x    x    x    x

prof.eng. Fabio Selleri

consultant

X

X

structural design

prof.eng. Fabio Castelli

consultant

X

X

hydraulic design

eng. Maurizio Orlando

full-time staff

X

X

structural design and calculations

eng. Cristiano Casamaggi

full-time staff

x

X

structural design and calculations

x x x x x

stud.eng. Sulejman Demirovic

training

x

X

structural design

stud.eng. Antonio Kriznanac

training

x

X

structural design


4. General Engineering Assignment Timeframe


Timeframe for the whole design stage - architectural and structural:

General Engineering assignment timeframe:

event

day

month

year

elapsed time

xx

contract signed

17

April

2000

xx

work starting date

5

May

2000

documents delivering by PCU to GE

inception report completion

15

June

2000

40 days after starting date

ICE 4th session

16

June

2000

xx

phase A work completion

20

July

2000

2.5 months after starting date

phase A work delivering

1

September

2000

xx

ICE 5th session

28

October

2000

xx

approval of phase A

5

November

2000

6 months after starting date

stone cut final design delivering

23

November

2000

6.5 months after starting date

phase B work completion

5

December

2000

7 months after starting date

phase B work delivering

15

December

2000

40 days after approval of Phase A

xx xx xx xx xx

comments from PCU TA

17

December

2000

xx

first revision completion

23

January

2001

1 month after given comments

xx xx xx xx xx

comments from PCU TA and ICE

21

February

2001

xx

partial delivering

9

March

2001

xx

second revision completion

20

March

2001

1 month after given comments

second revision delivering

23

March

2001

xx
xx xx xx xx xx

ICE 6th session

5

April

2001

xx
back   back to home page
ani.gif (16635 bytes)
GENERAL ENGINEERING - P.zzale Donatello 4 - 50132 Firenze - Italy - ph. +39 055 2345256 - fax. +39 055 2476074